Oxygen Nitrogen Acetylene gas plant Start Up After Short Shut


When Oxygen Nitrogen Acetylene gas Plant is stopped for short time, either due to electricity or maintenance or cooling water failure, the start up is not very lengthy as earlier.
Keep the following starting conditions: (Assume Drier 'A' on line)

VALVES OPEN FOR OXYGEN NITROGEN ACETYLENE PLANTS:

A-1, A-5, A-13, A-14, N-1, N-3, N-6, N-8, N-9, N-10, V8, V8A, V4 and V5 3 to 4 turns open depending on length of shut down.

VALVES CLOSE  NITROGEN ACETYLENE OXYGEN GAS PLANT:

V3, A-2, A-3, A-4, A-6, A-7, A-8, A-9, A-1O, VII/1, V1/2, A-13, A-14, 02, N-4, N-5, N-7, V8, V8A, 0-5, 0-6 Drain Valves 0-1 to 0-4.
(A-2 valve may be provided in higher capacities only)

All pressure gauges isolation valves should be a lightly opened and level gauge 'valves are to be opened, start the Air Compressor after ensuring cooling water supply. Close interstate drain valves and adjust air pressure in P-C to about 40 kgs. /cm2 by valve A-1 & A -2

Pressurize drier which was on operation (Assume 'A' by opening A-7. After pressurizing open A-3 fully and close A-7.After pressurizing Drier gradually open V1/1 and pressurize Heat Exchanger watching P-1 pressure. After pressurizing open V111 completely.

Start Expansion Engine. Set hydraulic system and pressure properly. Keep cam around 3 positions. Open air inlet valve A-13 & A-14


Watch P-2 and P-3 pressures. When pressures are normal start drier regeneration. Start drier heater if required.

Admit Nitrogen to evaporating cooler by opening N-2 and closing N-3.

Watch temperatures T-1 and T-2 when they are -100 Deg.C. 1-90 Deg.C. And 140 Deg.C. Respectively and open V3 valve.

Close V4 and V5 valves watching Upper Column level in L-2 to be within limits.

Check Oxygen Purity after setting V3, V4, V5 valves and Expansion Engine cam settings

When purity is normal start LO. Pump and start filling cylinders as mentioned earlier.

5





Universal Industrial Plants Mfg. Co. (P) Ltd.
A 104/2, Okhla Industrial Area, Phase-2, New Delhi – 110 020
Phone :+(91)-(124)-4386250, +(91)-(124)-5519863 Fax :+(91)-(124)-4386234
Mobile : +(91)-9810626301
Email : info@oxygengasplant.net , info@universalboschi.com

   
   

This design is a copyright of Ing L&A BOSCHI Italy and Universal Industrial Plants Mfg. Co. and copy of any written material, photographs and diagrams from website is strictly prohibited. Any unauthorised use shall be liable for prosecution