Start Up of Oxygen gas Plants, Nitrogen gas  Plants, Acetylene gas Plants  and After Defrost of Oxygen gas Plant, Nitrogen gas Plants Acetylene gas Plant



1: Ensure availability of electricity at normal voltage and enough water levels.

2: Check oil levels of all running machineries are normal.

3:. Start cooling water circulation to Air Compressor and ensure continuous water flow at all outlets.

4: Rotate flywheel of all running machineries by hand at least one full run for free rotation. Ensure Expansion Engine Inlet Valve A 13 is closed.

5: Keep the following valve settings:- (Assume drier 'A' on line)

VALVE OPEN OF NITROGEN OXYGEN ACETYLENE GAS PLANT:

A-1, A-2, A-5, A-14, N-1, N-3, N-6, N-8, N-9, N;.10, 0-4 V4 and V5 to be kept 10 turns open.

VALVES CLOSE NITROGEN GAS OXYGEN GAS ACETYLENE GAS PLANT:

V3, A-3, A-4, A-6, A-7, A-8, A-9, A-10, VI/1, VI/2, A-12 (optional), A-13, 02,01 N-2, N-4, N-5, N-7, V8, V8A, 0-3, 0-5, 0-6,06, Drain valves & 0-3 & 0-4.

All pressure gauge isolation valves should be kept slightly open. level Gauge Isolation Valves are to be kept closed.

6: Start the Air Compressor as per Compressor Manual. After attaining full speed, close the inter-stage separator drain valves. Close A-2 completely. Close A-1 partially, watching Air Pressure in P-4, to be about 40 kg. /cm2. Ensure that oil feed to each cylinder is as prescribed in compressor manual. If oil is feed more than required, it will form hydrocarbon and cause explosion of distillation column. Excess air temperature in cylinders also can cause hydrocarbon formation.

7. Gradually pressurize Molecular Sieve Drier, which is ready for operation (Assume 'A') through pressurizing Valve, watching. When P-5 is almost near P-4, open Air Inlet A-3 to Drier. Due to sudden pressurizing and depressurizing Molecular Sieve pellets become powder and its life will reduce.

8. Now air ready to be admitted to Cold Box. Open VI/1 slowly watching pressure. Now air will be blown through drains V6 and V7. Blow the airlines a few times by closing and opening a VI/1.

9. By Pass valve VI has been provided to give extra cooling and is gradually closed after the cooling of the engine starts when T2 _etches (-) 1350 C.

10. Thereafter close VI/1, VII/1, V11, V6 and V7.

11. Now again open VI/1 slowly watching Air Pressure in P-1. After pressurizing, open VI/1 fully.

12. Now the Expansion Engine should be started electrically. Keep the Inlet Valve hydraulic system lever in 'Stop' position. Oil Pressure in P-15 should be at least 1 Kgs./cm2. Then release all air locks in hydraulic system. Keep the Inlet cam in positions. Now put Inlet Valve to run positions. Now both inlet and outlet valve pestles should work. Open the air inlet valve A-13, slowly watching P-7 and P-8 pressure gauges. Then A-13 should be opened fully.

13. The lower column pressure P-2 also will go up. During initial start up, the pressure will be about 3 to 4 kgs./cm2 in P-2 and about 0.4 to 0.5 kgs./cm2 in P-3, upper column pressure.

14.After reaching a steady upper column pressure in P-3, regeneration should be started to regenerate off the line drier. After checking drier cycles, heating should be started.

15. The Nitrogen to the evaporating cooler should be admitted by opening valve N-2. Valve N-3 must be closed watching upper column pressure. If there is excess water in evaporation cooler, it will generate a back pressure on upper column P-3, which should not exceed 0.6 to 0.7 kgs./cm2. Ensure the Nitrogen Pipe just dips into water.

16. Now watch air pressure in P-1, P-2, P-3 and in P-4. They should be steady. Slowly increase air pressure in P-4 by closing A-1 gradually, so that, discharge pressure in P-4, is about 45 to _O kgs. /cm2. Take care that P-2 and P-3 does not go up. Also watch heat of expansion engine cylinder if new piston rings have been used. If it is warm, reduce air pressure slightly.

17: Now watch temperature, Expansion Engine Outlet T-2 and Expansion Engine Inlet T-1. These will start cooling. After about 2 Y:z to 3 hours T-1 will reach -90to 100 Deg.C. And T-2 will reach -140 to 150 Deg. C. (Unto -165°C is OK)

5





Universal Industrial Plants Mfg. Co. (P) Ltd.
A 104/2, Okhla Industrial Area, Phase-2, New Delhi – 110 020
Phone :+(91)-(124)-4386250, +(91)-(124)-5519863 Fax :+(91)-(124)-4386234
Mobile : +(91)-9810626301
Email : info@oxygengasplant.net , info@universalboschi.com

   
   

This design is a copyright of Ing L&A BOSCHI Italy and Universal Industrial Plants Mfg. Co. and copy of any written material, photographs and diagrams from website is strictly prohibited. Any unauthorised use shall be liable for prosecution