Molecular Sieve Driers for Air Separation Plants, Oxygen Plants, Nitrogen Plants, Acetylene Plants

 

 

Our Catalogue Process Description 3-D Presentation
Technical Specifaction Check List & Salient Features Safety
Operation Manual Photo Gallery Flow Diagram
Other Information Plant Layouts Molecular Liquid Plants

Molecular Sieve Driers for Air Separation Plants, Oxygen Plants, Nitrogen Plants, Acetylene Plants The drier valve seats should be in prefect condition and if the air passes through valve seat both production of plant and regeneration of driers will-be affected.

IMPORTANT Equipment for Molecular Sieve Driers for Air Separation Plant, Oxygen Plant, Nitrogen Plant, Acetylene Plant:

The Heater should immediately be shut down either in case of Plant shut down or Expansion Engine shut down. Otherwise, water and water vapor will be drawn from evaporation cooler by the Blower and will flood the Heater and the drier with water. DRIER CHANGE OVER:

When cooling is complete, the regenerated drier is to be lined up, as the other drier would have become saturated by now. First, the Nitrogen blower is to be switched off. The Nitrogen valves of regenerated drier are to be closed. Then the regenerated drier will first be pressurized through pressurizing valve. The pressuring shouldn't, be sudden and hence not through main air inlet valve. The Molecular Sieve pallets will get disintegrated soon if pressurizing and depressurizing is sudden. After pressurizing open air inlet valve completely. Open air outlet valve gradually, watching the outlet air temperature. This temperature will initially go up and thereafter will cool--down. Then open the outlet valve completely. Start closing the outlet valve of the drier on line, taking care of common air outlet temperature. Then close air outlet and inlet valves of drier, which was on line tightly.

Depressurize the drier by depressurizing
valve. The open the Nitrogen valves of the drier to be regenerated. Start the Nitrogen Blower. Check flow of the gas at the regeneration Nitrogen vent. The switch on the drier heater for starting heating cycle of drier. Check for proper performance of drier heater.

DRIER CHANGEOVER (In Short):
Imagine No.1 drier is ready after regeneration. (In case of No.2 Drier adjusts the valves given in brackets.)

1. Stop Heater.

2. Close N-5 and N-7. (N-6 & N-8)

3. Close A-9 and open A-7 and A-8

4. Watch P-5 to increase gradually for Y2 an hour. (P-6)

5. When P-5 and P-6 are almost equal, open A-3. (A-4)

6. Close A-:7, A-8 and A-9.

7. Open A-5 slowly watch T-4. (A-6)

8. After 15 minutes on A-5 fully and start Closing A-6 slowly. (A-6, A-5)

9. After 15 minutes close A-6 and A-4 Completely. (A-5, A-3)

10. Open A-9 and A-8 (A-9, A-7)

11. P-6 will come down (P-5)

12. When P-6 reads minimum, open N-6 & N-8 (P-5, N-5, N-7) Start heater and check the amperes in each phase To ensure that no heater is burnt.

All Starting Drier Heater and watch T-13.

REPLACEMENT OF MOLECULAR SIEVE FOR NITROGEN ACETYLENE OXYGEN PLANT:

Molecular Sieve is to be replaced if:

It becomes powder.
If it gets contaminated by oil; or
If it looses its adsorption capacity:

The above will be known by frequent checking of Cold Box Equipments.

To change Molecular Sieve, open the top and bottom flanges of drier vessels. Remove the filter at the bottom. Collect the old Molecular Sieve, which will fall down. Clean the filters blow the drier vessel.

Fit the bottom filter. Charge about 3 kgs. of Alumina. Then charges Molecular Sieve Type 13X, size 1.5 mm., size 1.5 mm. about 90 kegs. The Molecular Sieve should be sieved and be free of all smaller size particles. It is better to charge through a long funnel so that Molecular Sieve does not fall with a force and break. Charging is normally done by hand. When leve1 of Molecular Sieve is just at the brim of dished end of prier vessel, stop charging. Then fill up the doomed portion with alumina. Fit the top filter after cleaning.

 






Universal Industrial Plants Mfg. Co. (P) Ltd.
A 104/2, Okhla Industrial Area, Phase-2, New Delhi – 110 020
Phone :+(91)-(124)-4386250, +(91)-(124)-5519863 Fax :+(91)-(124)-4386234
Mobile : +(91)-9810626301
Email : info@oxygengasplant.net , info@universalboschi.com

   
   

This design is a copyright of Ing L&A BOSCHI Italy and Universal Industrial Plants Mfg. Co. and copy of any written material, photographs and diagrams from website is strictly prohibited. Any unauthorised use shall be liable for prosecution